The structure is made of 4 semicircular vaults of 2.45 m opening each.
Bridge over the Egvonne (RD 19)
Structure studied for an abnormal-load convoy of 99.53 tonnes.
Structure studied for an abnormal-load convoy of 99.53 tonnes.
The structure is made of 4 semicircular vaults of 2.45 m opening each.