The structure is a masonry arch bridge with 7 segmental spans.
Bridge over the Hers – Mirepoix (RD 119)
Structure studied for several abnormal-load convoys with a mass between 130.73 and 250.73 tonnes.
Structure studied for several abnormal-load convoys with a mass between 130.73 and 250.73 tonnes.
The structure is a masonry arch bridge with 7 segmental spans.