This structure is a reinforced-concrete girder bridge with 2 simply supported skew spans of 2 x 19.30 m for a total length of 46.00 m.
Bridge over the Indre – Esvres (RD 85)
Structure studied for several abnormal-load convoys with a mass between 111.82 and 119.94 tonnes.