The studied structure is a composite twin-girder bridge (regularly braced) with a single span of 32.00 m.
Structure studied for an abnormal-load convoy of 109.41 tonnes.
The studied structure is a composite twin-girder bridge (regularly braced) with a single span of 32.00 m.