All structures assessed

Bridge over the Limone (RD 538)

Structure studied for an abnormal-load convoy of 109.41 tonnes.

Bridge over the Limone (RD 538)

The PIPO (open portal frame) has one skew span of 12.21 m opening. The total square width of the deck is 12.00 m.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.