All structures assessed

Bridge over the Crau drainage canal – Saint-Martin-de-Crau (RN 568)

Structure studied for an abnormal-load convoy of 96 tonnes.

Bridge over the Crau drainage canal – Saint-Martin-de-Crau (RN 568)

The PICF (closed frame) has 2 spans of 5.15 m each. It carries two traffic lanes and two shoulders of 3.60 m and 2.80 m.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.