The studied structure is a composite twin-girder bridge with 3 spans of 23.44 m, 25.13 m and 21.44 m respectively (estimated lengths).
Structure studied for an abnormal-load convoy of 126.002 tonnes.
The studied structure is a composite twin-girder bridge with 3 spans of 23.44 m, 25.13 m and 21.44 m respectively (estimated lengths).