All structures assessed

Bridge over the Champagne–Burgundy canal – Chaumont (RD 674)

Structure studied for several abnormal-load convoys with a mass between 127 and 131 tonnes.

Bridge over the Champagne–Burgundy canal – Chaumont (RD 674)

The reinforced-concrete girder bridge has one skew span of 17.32 m. It has a deck of 9.90 m width.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.