The structure is a masonry arch bridge with 3 spans of 8.00 m opening each.
Bridge over the Clain (RD 1)
Structure studied for several abnormal-load convoys with a mass between 105.23 and 144.58 tonnes.
Structure studied for several abnormal-load convoys with a mass between 105.23 and 144.58 tonnes.
The structure is a masonry arch bridge with 3 spans of 8.00 m opening each.