All structures assessed

Bridge over the Clain (RD 1)

Structure studied for several abnormal-load convoys with a mass between 105.23 and 144.58 tonnes.

Bridge over the Clain (RD 1)

The structure is a masonry arch bridge with 3 spans of 8.00 m opening each.