The structure is made of steel girders topped with brick jack arches. It has 1 span of 13.05 m opening. The carriageway is two-way, 6.60 m wide (between kerbs).
Structure studied for an abnormal-load convoy of 94 tonnes.
The structure is made of steel girders topped with brick jack arches. It has 1 span of 13.05 m opening. The carriageway is two-way, 6.60 m wide (between kerbs).