All structures assessed

Bridge over the Don at Trénou (RN 137)

Structure studied for several abnormal-load convoys with a mass between 123 and 131 tonnes.

Bridge over the Don at Trénou (RN 137)

It is a masonry bridge with a single basket-handle vault of 14.00 m opening.