All structures assessed

Bridge over the Guiers Vif – Entre-Deux-Guiers (D 102C)

Structure studied for an abnormal-load convoy of 103.82 tonnes.

Bridge over the Guiers Vif – Entre-Deux-Guiers (D 102C)

The structure is made of two different, independent structures.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.