All structures assessed

Bridge over the Pozon – Vatan

Structure studied for an abnormal-load convoy of 115 tonnes.

Bridge over the Pozon – Vatan

The reinforced-concrete slab has 1 span of 2.00 m opening for a total slab length of 2.95 m.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.