The bridge is a semicircular arch bridge with three vaults.
Bridge over the Blomard stream – Les Tourrettes (RN 7)
Structure studied for an abnormal-load convoy of 164.604 tonnes.
Structure studied for an abnormal-load convoy of 164.604 tonnes.
The bridge is a semicircular arch bridge with three vaults.