All structures assessed

Bridge over the Chavanne stream – Goncelin (RD 525)

Structure studied for an abnormal-load convoy of 68 tonnes.

Bridge over the Chavanne stream – Goncelin (RD 525)

The structure is a masonry vault of 1.80 m opening, widened by a reinforced-concrete girder and cross-girder structure with three spans of 5.70 m, 8.55 m and 5.70 m respectively.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.