All structures assessed

Bridge over the Flamence stream (RD 550)

Structure studied for an abnormal-load convoy of 127.79 tonnes.

Bridge over the Flamence stream (RD 550)

As no archives were available for the structure, a visit was carried out on 10 December 2024 to measure its dimensions.