The structure is a PRAD (prestressed-girder overbridge) with 2 continuous skew spans of 21.16 m each.
Structure studied for several abnormal-load convoys with a mass between 107 and 115 tonnes.
The structure is a PRAD (prestressed-girder overbridge) with 2 continuous skew spans of 21.16 m each.