The PRAD (prestressed-girder overbridge) has 9 girders over a skew span of 30 m. It has two identical decks of 12.24 m width each. The loadable width is 10 m.
PS 1270-3.0 (A19) – Chevilly
Structure studied for an abnormal-load convoy of 120 tonnes.
Structure studied for an abnormal-load convoy of 120 tonnes.
The PRAD (prestressed-girder overbridge) has 9 girders over a skew span of 30 m. It has two identical decks of 12.24 m width each. The loadable width is 10 m.