All structures assessed

PS 1287 (A62) – Layrac (RN 21)

Structure studied for several abnormal-load convoys with a mass between 67 and 69 tonnes.

PS 1287 (A62) – Layrac (RN 21)

The VIPP (prestressed-girder bridge) has 3 independent spans of 3 x 38 m.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.