All structures assessed

PS 135 (A68)

Structure studied for an abnormal-load convoy of 99 tonnes.

PS 135 (A68)

The PS 135 is a PSDP (prestressed-slab overbridge). It has 4 skew spans of 11.20 m, 15.70 m, 20.50 m and 13.50 m respectively. The slab is 83 cm thick under the carriageway and thinner under the footways.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.