All structures assessed

PS 1381/19 (A85) – Faverolles-sur-Cher (RD 764)

Structure studied for an abnormal-load convoy of 103.358 tonnes.

PS 1381/19 (A85) – Faverolles-sur-Cher (RD 764)

The PSDA (slab overbridge) has 2 skew spans of 12.06 m each. The total width of the deck is 9.058 m.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.