All structures assessed

PS 14/14 (A10)

Structure studied for an abnormal-load convoy of 96 tonnes.

PS 14/14 (A10)

The structure is a prestressed-concrete twin-rib slab bridge.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.