The PSDP (prestressed-slab overbridge) has 4 skew spans of 11.79 m, 16.75 m, 20.25 m and 14.25 m respectively.
Structure studied for several abnormal-load convoys with a mass between 107.03 and 108.25 tonnes.
The PSDP (prestressed-slab overbridge) has 4 skew spans of 11.79 m, 16.75 m, 20.25 m and 14.25 m respectively.