The structure is a PRAD (prestressed-girder overbridge) with 4 skew spans of 10.657 m, 2 x 16.392 m and 10.657 m respectively.
Structure studied for several abnormal-load convoys with a mass between 80.5 and 116.71 tonnes.
The structure is a PRAD (prestressed-girder overbridge) with 4 skew spans of 10.657 m, 2 x 16.392 m and 10.657 m respectively.