All structures assessed

PS 1563 (A89) – Saint-Rabier (D 704)

Structure studied for an abnormal-load convoy of 89.889 tonnes.

PS 1563 (A89) – Saint-Rabier (D 704)

The PSDP (prestressed-slab overbridge) has 4 skew spans of 13.00 m, 20.00 m, 20.00 m and 22.60 m.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.