All structures assessed

PS 164.9 (A29) – Thieulloy-l’Abbaye (D 901)

Structure studied for an abnormal-load convoy of 150 tonnes.

PS 164.9 (A29) – Thieulloy-l’Abbaye (D 901)

The PSDP (prestressed-slab overbridge) has 3 skew spans of 13.50 m, 24.33 m and 13.50 m respectively. The total deck length is 53.17 m; the geometric skew is 67 gradians.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.