The structure is a PRAD (prestressed-girder overbridge) with 2 spans of 17.70 m and 21.60 m respectively. It has 15 girders.
PS 172.6 G1 (A16)
Structure studied for an abnormal-load convoy of 72 tonnes.
Structure studied for an abnormal-load convoy of 72 tonnes.
The structure is a PRAD (prestressed-girder overbridge) with 2 spans of 17.70 m and 21.60 m respectively. It has 15 girders.