All structures assessed

PS 172 (A88)

Structure studied for several abnormal-load convoys with a mass between 107 and 136.52 tonnes.

PS 172 (A88)

The PRAD (prestressed-girder overbridge) has 2 skew spans of 2 x 18.55 m.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.