The PRAD (prestressed-girder overbridge) has 2 skew spans of 2 x 18.55 m.
Structure studied for several abnormal-load convoys with a mass between 107 and 136.52 tonnes.
The PRAD (prestressed-girder overbridge) has 2 skew spans of 2 x 18.55 m.