All structures assessed

PS 174.2 (A16)

Structure studied for an abnormal-load convoy of 72 tonnes.

PS 174.2 (A16)

The structure is a PSDP (prestressed-slab overbridge) with 4 spans of 13.00 m, 13.725 m, 17.445 m and 11.80 m respectively.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.