The PSDP (prestressed-slab overbridge) has 3 skew spans of 14.37 m, 26.13 m and 14.37 m respectively.
Structure studied for several abnormal-load convoys with a mass between 111.1 and 115.63 tonnes.
The PSDP (prestressed-slab overbridge) has 3 skew spans of 14.37 m, 26.13 m and 14.37 m respectively.