According to the archive drawings, this PSDP (prestressed-slab overbridge) has a total skew length of 51.90 m and 2 skew spans of 25.81 m and 24.72 m respectively. The geometric skew is about 74 gradians.
Structure studied for several abnormal-load convoys with a mass between 85.98 and 107.45 tonnes.
According to the archive drawings, this PSDP (prestressed-slab overbridge) has a total skew length of 51.90 m and 2 skew spans of 25.81 m and 24.72 m respectively. The geometric skew is about 74 gradians.