All structures assessed

PS 1929 (A62)

Structure studied for several abnormal-load convoys with a mass between 50 and 65 tonnes.

PS 1929 (A62)

The A62 PS 1929 is a PSDP (prestressed-slab overbridge). It has 4 skew spans of 14.782 m, 26.561 m, 26.561 m and 14.782 m respectively.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.