The PSDN (ribbed-slab overbridge) has 2 skew spans of 28.78 m and 26.103 m respectively.
Structure studied for several abnormal-load convoys with a mass between 229.59 and 273.584 tonnes.
The PSDN (ribbed-slab overbridge) has 2 skew spans of 28.78 m and 26.103 m respectively.