All structures assessed

PS 227.7 (A29) – Herleville

Structure studied for several abnormal-load convoys with a mass between 135 and 137.62 tonnes.

PS 227.7 (A29) – Herleville

The PSDA (slab overbridge) has 4 skew spans of 8.80 m, 2 x 10.95 m and 8.80 m respectively. The total square width is 7.90 m, with a 5.50 m carriageway flanked by 1.00 m usable-width footways.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.