The structure is a PRAD (prestressed-girder overbridge) with 4 continuous spans of 12.90 m, 17.90 m, 21.50 m and 12.90 m respectively. It is made of two decks with a usable width of 11.50 m on the Bordeaux side and 14.25 m on the Narbonne side.
Structure studied for several abnormal-load convoys with a mass between 193.24 and 211.54 tonnes.
The structure is a PRAD (prestressed-girder overbridge) with 4 continuous spans of 12.90 m, 17.90 m, 21.50 m and 12.90 m respectively. It is made of two decks with a usable width of 11.50 m on the Bordeaux side and 14.25 m on the Narbonne side.