The A11 PS 2285 is a PSDP (prestressed-slab overbridge). It has 4 skew spans of 11.80 m, 16.36 m, 15.14 m and 12.50 m respectively.
Structure studied for an abnormal-load convoy of 150 tonnes.
The A11 PS 2285 is a PSDP (prestressed-slab overbridge). It has 4 skew spans of 11.80 m, 16.36 m, 15.14 m and 12.50 m respectively.