All structures assessed

PS 2316 (A11) – Huillé-Lézigné (RD 323)

Structure studied for an abnormal-load convoy of 150 tonnes.

PS 2316 (A11) – Huillé-Lézigné (RD 323)

The A11 PS 2316 is a PSDP (prestressed-slab overbridge). It has 4 skew spans of 13.90 m, 19.00 m, 19.00 m and 14.70 m respectively.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.