All structures assessed

PS 2349 (A61) – Balma

Structure studied for an abnormal-load convoy of 152.79 tonnes.

PS 2349 (A61) – Balma

The structure is a PSDP (prestressed-slab overbridge) with a total length of 55.778 m. It has 4 skew spans of 10.26 m, 2 x 17.05 m and 10.26 m respectively.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.