All structures assessed

PS 244 (A7) – RD 519

Structure studied for several abnormal-load convoys with a mass between 104 and 120 tonnes.

PS 244 (A7) – RD 519

The PSDP (prestressed-slab overbridge) has 4 skew spans of 11.77 m, 2 x 16.82 m and 11.77 m respectively.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.