The A7N PS 279 is a PSDP (prestressed-slab overbridge). It has 4 skew spans of 14.79 m, 17.73 m, 15.28 m and 10.51 m respectively.
Structure studied for an abnormal-load convoy of 290.5 tonnes.
The A7N PS 279 is a PSDP (prestressed-slab overbridge). It has 4 skew spans of 14.79 m, 17.73 m, 15.28 m and 10.51 m respectively.