All structures assessed

PS 296 (A89)

Structure studied for several abnormal-load convoys with a mass between 94 and 99 tonnes.

PS 296 (A89)

The PSDP (prestressed-slab overbridge) has 2 skew spans of 26.72 m and 23.06 m. The 8.50 m wide carriageway carries 2 traffic lanes and is flanked by 0.50 m shoulders. Each footway is 0.78 m wide.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.