All structures assessed

PS 30-27 (A81) – Saint-Jean-sur-Erve (D 57)

Structure studied for several abnormal-load convoys with a mass between 112 and 115 tonnes.

PS 30-27 (A81) – Saint-Jean-sur-Erve (D 57)

The PSDP (prestressed-slab overbridge) has 4 skew spans of 21.203 m, 31.805 m, 31.805 m and 21.203 m respectively.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.