All structures assessed

PS 325.3 (A4)

Structure studied for an abnormal-load convoy of 115.85 tonnes.

PS 325.3 (A4)

The structure is a prestressed-concrete twin-rib slab bridge.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.