All structures assessed

PS 3419 (A20) – Lamothe-Cassel (RN 20)

Structure studied for several abnormal-load convoys with a mass between 81 and 87 tonnes.

PS 3419 (A20) – Lamothe-Cassel (RN 20)

The PS 3419 is a PSDP (prestressed-slab overbridge). It has 3 skew spans of 24.33 m, 30.78 m and 18.94 m respectively.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.