The PS 3445 is a PSDP (prestressed-slab overbridge). It has 4 skew spans of 13.09 m, 16.53 m, 18.22 m and 10.93 m respectively.
Structure studied for several abnormal-load convoys with a mass between 81 and 87 tonnes.
The PS 3445 is a PSDP (prestressed-slab overbridge). It has 4 skew spans of 13.09 m, 16.53 m, 18.22 m and 10.93 m respectively.