The A81 PS 40-37 is a PSDP (prestressed-slab overbridge). It has 4 skew spans of 9.989 m, 14.983 m, 14.983 m and 9.989 m respectively.
Structure studied for several abnormal-load convoys with a mass between 95 and 119.97 tonnes.
The A81 PS 40-37 is a PSDP (prestressed-slab overbridge). It has 4 skew spans of 9.989 m, 14.983 m, 14.983 m and 9.989 m respectively.