All structures assessed

PS 404.7 (A4)

Structure studied for an abnormal-load convoy of 96 tonnes.

PS 404.7 (A4)

The prestressed-concrete slab has 4 skew spans of 12.875 m, 18.02 m, 14.695 m and 14.41 m.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.