The structure is a prestressed-concrete slab bridge (PSDP) with a total length of 54 m.
Structure studied for several abnormal-load convoys with a mass between 125.7 and 128.5 tonnes.
The structure is a prestressed-concrete slab bridge (PSDP) with a total length of 54 m.