All structures assessed

PS 42.3 (A2) – Hordain (RD 630)

Structure studied for several abnormal-load convoys with a mass between 213.22 and 217.6 tonnes.

PS 42.3 (A2) – Hordain (RD 630)

The PSDP (prestressed-slab overbridge) has 4 skew spans of 13.40 m, 16.38 m, 16.38 m and 13.40 m.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.