All structures assessed PS 435 (A46) – Saint-Priest Structure studied for an abnormal-load convoy of 89.66 tonnes. The prestressed-concrete slab has 2 skew spans of 28.75 m and 27.75 m. Bending moments in the deck under the convoy studied.